TEPCO starts pumping up Fukushima groundwater


FUKUSHIMA (Jiji Press) — Tokyo Electric Power Co. started pumping up groundwater from wells at its disaster-stricken Fukushima No. 1 nuclear power plant on Thursday in an operation to prevent radiation-tainted water from increasing further.

TEPCO plans to remove radioactive substances from the pumped-up water.

The groundwater will be released into the sea if radiation levels fall below preset limits after the cleanup. When to start the water release has yet to be decided.

On Thursday, TEPCO was to pump up a total of 100-200 tons of groundwater from 20 of the 41 wells, called subdrains, located near the No. 1 to No. 4 reactor buildings at the plant, which was damaged in the March 2011 earthquake and tsunami. The water will be stored temporarily at a tank with a capacity of 1,000 tons.

At the plant in Fukushima Prefecture, groundwater flows into the reactor buildings and mixes with water that has become highly contaminated with radioactive substances after being used to cool melted nuclear fuel, leading to an increase in the amount of tainted water.

On Aug. 25, the Fukushima Prefectural Federation of Fisheries Cooperative Associations decided to allow TEPCO to release purified groundwater into the sea.

Source: Japan News (Jiji)
http://the-japan-news.com/news/article/0002399819

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s